Analisis Implementasi Manajemen Risiko Pada Pembangunan Museum dan Galeri Seni SBY*Ani Dengan HIRARC (Hazard Identification, Risk Assessment, And Risk Control)
DOI:
https://doi.org/10.53866/jimi.v2i1.28Keywords:
Risk Management, Health, Safety and Environment, HIRARCAbstract
One of the obstacles when working on a construction site is industrial accidents. This is evidenced by the number of accidents at work in 2020. The number increased from 85,109 at the beginning of 2020 to 108,573. This study aims to define implementing the K3L risk management system and measures to minimize emerging risks. This study used descriptive qualitative methods. The data analysis process is conducted through Hazard Identification, Risk Assessment, and Risk Control (HIRARC), which includes three steps: risk identification, risk analysis or assessment, and risk mitigation. Data was collected by distributing checklist questionnaires to 30 employees and interviewing HSE project managers. Data were obtained from various sources relevant to the study. A study of the project identified 29 risk variables. According to the processed data, when constructing a roof with a risk index of 5.90, it is known that the most significant risk appears in the variable risk of falling from a high place. On the other hand, the slightest breakage risk of the Sling TC hazard variable is 2.56 when read from cast steel structures with the resulting hazard index. It is essential to monitor risk as a form of continuous improvement to minimize risk when suppressing or reducing its likelihood and severity
References
Fazani, F. (2020). Angka Kecelakaan Kerja Tahun 2020 Meningkat. Merdeka.Com. https://www.merdeka.com/foto/peristiwa/1233769/20201021125723-angka-kecelakaan-kerja-tahun-2020-meningkat-001-nfi.html
Haworth, N., & Hughes, S. (2012). The International Labour Organization. In Handbook of Institutional Approaches to International Business. https://doi.org/10.4337/9781849807692.00014
Kemnaker, B. H. (2020). Menaker: Jadikan K3 Sebagai Prioritas Dalam Bekerja. Kemnaker.Go.Id. https://kemnaker.go.id/
Ismiyati, Ranggi Sanggawuri, Mudjiastuti Handayani. (2019). Penerapan Manajemen Resiko pada Pembangunan Proyek Perpanjangan Dermaga log (Studi Kasus: Pelabuhan Dalam Tanjung Emas Semarang). Media Komunikasi Teknik Sipil 25(2): 209-220.
Dharma, A.A.B. Dkk. (2017). Manajemen Risiko Keselamatan dan Kesehatan Kerja (K3) Pada Proyek Pembangunan Jambuluwuk Hotel dan Resort Petitenget. Jurnal Spektran 5(1): 1-87.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2022 Tahta Athallah Nur Cahyo, Agung Sutarto

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

















