PERBANDINGAN ESTIMASI ANGGARAN BIAYA METODE AHSP 2022 DAN HSPK 2022 PADA PROYEK PEMBANGUNGAN GEDUNG UKM POLITEKNIK PU SEMARANG
DOI:
https://doi.org/10.53866/jimi.v3i1.226Keywords:
Budget estimate plan, AHSP, HSPK.Abstract
The Budget Plan is an important process in project planning as it forms the basis for making a price offer and estimation framework that will be used in tendering. It aims to consider the cost involved during the project implementation. The aim of this study is to determine which method is more economical in estimating the budget cost using the 2022 AHSP and 2022 HSPK methods. The research method used is a combination of observation and comparative quantitative methods. Observation was carried out through direct observation of structural work and work methods, while comparative quantitative method aims to estimate budget costs using the 2022 AHSP and 2022 HSPK methods. Based on the cost estimate, it can be concluded that the labor cost using the AHSP method is IDR 5,305,910,140 and using the HSPK method is IDR 31,967,258,039 with a difference percentage of 33.74%. The material cost using the AHSP method is IDR 30,389,347,431 and using the HSPK method is IDR 22,208,028,819 with a difference percentage of 0.49%. The budget plan using the AHSP method is IDR 31,980,611,351 and using the HSPK method is IDR 28,189,908,555 with a difference percentage of 5.24%. In this study, the result shows that the most economical budget cost estimate was obtained by using the HSPK method in the overall budget plan, as well as labor and material costs.
References
Aji, Krisna. (2020). Analisis Perbandingan Biaya Penggunaan Bekisting Konvensonal dan Bekisting Sistem untuk Pekerjaan Kolom Gedung HSSE PLN. Semarang: Universitas Negeri Semarang.
Direktorat Jendral Cipta Karya Kementerian PUPR. (2017). Buku D Panduan Perhitungan Rencana Anggaran Biaya IPL. Jakarta: Kementerian Pekerjaan Umum dan Perumahan Rakyat Republik Indonesia.
Ibrahim, H.Bachtiar. (1993). Rencana & Estimate Real of Cost. Jakarta: Bumi Aksara.
Melani, Dea. (2021). Evaluasi Estimasi Rencana Anggaran Biaya (RAB) Dengan Metode AHSP dan Analisa Bina Marga (K) Proyek Pembangunan Jalan Transmigrasi Teget Kabupaten Bener Meriah. Medan: Universitas Muhammadiyah Sumatera Utara.
Nursetyo, Gatot. (2020). Kajian Permainan Dalam Aturan Lelang Proyek. Surakarta: Universitas Tunas Pembangunan.
Peraturan Menteri Pekerjaan Umum Dan Perumahan Rakyat Nomor 1 Tahun 2022. (2022). Pedoman Penyusunan Perkiraan Biaya Pekerjaan Konstruksi Bidang Pekerjaan Umum Dan Perumahan Rakyat. Indonesia: Kementerian Pekerjaan Umum dan Perumahan Rakyat Republik Indonesia.
Peraturan Walikota Semarang Nomor 17 Tahun 2022. (2022). Peraturan Walikota (Perwali) tentang Standarisasi Harga Satuan Bahan Bangunan, Upah dan Analisa Pekerjaan Untuk Kegiatan Pembangunan Pemerintah Kota Semarang Tahun Anggaran 2022. Semarang: Pemerintah Kota Semarang.
Sastraadmadja, S. A. (1994). Analisa Biaya Pelaksanaan, Bandung: Nova.
Rusuna, T. Yuan. (2019). Analisa Perbandingan Rencana Anggaran Biaya Pembangunan Mall Widuri Dengan Menggunakan Metode BOW, SNI 2008 dan AHSP 2016. Medan: Universitas Muhammadiyah Sumatera Utara.
Ulfayana, M. (2022) Analisa Perbandingan Harga Satuan Pekerjaan SNI 2008 dengan SNI 2017 (Studi Kasus Pekerjaan Pembangunan Mako Polsek Gangga). Mataram : Universitas Muhamadiyah Mataram.
Widodo, S. A., Yakin, K., & Nugroho, W. A. (2020). Analisis Perbandingan Nilai Proyek Dengan Standar Nasional Indonesia (SNI) Dan Harga Satuan Pokok Kegiatan (HSPK) (Studi Kasus: SDN Kedung Cowek Baru). Lamongan : Universitas Islam Lamongan.
Downloads
Published
Issue
Section
License
Copyright (c) 2023 Agung Sutarto, M. Faizal Ardhiansyah Arifin, Aufa Ardianto

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.