Sutarto, A. and Fauzy, K. I. (2023) “ANALISA OPTIMASI WAKTU DAN BIAYA DENGAN MENGGUNAKAN METODE DURATION COST TRADE OFF PADA PROYEK PEMBANGUNAN PENANGANAN ROB ERETAN KABUPATEN INDRAMAYU JAWA BARAT”, Citizen : Jurnal Ilmiah Multidisiplin Indonesia, 3(1), pp. 70–76. doi: 10.53866/jimi.v3i1.101.