SUTARTO, A.; FAUZY, K. I. ANALISA OPTIMASI WAKTU DAN BIAYA DENGAN MENGGUNAKAN METODE DURATION COST TRADE OFF PADA PROYEK PEMBANGUNAN PENANGANAN ROB ERETAN KABUPATEN INDRAMAYU JAWA BARAT. Citizen : Jurnal Ilmiah Multidisiplin Indonesia, [S. l.], v. 3, n. 1, p. 70–76, 2023. DOI: 10.53866/jimi.v3i1.101. Disponível em: https://journal.das-institute.com/index.php/citizen-journal/article/view/101. Acesso em: 14 may. 2026.