Sutarto, A., & Fauzy, K. I. (2023). ANALISA OPTIMASI WAKTU DAN BIAYA DENGAN MENGGUNAKAN METODE DURATION COST TRADE OFF PADA PROYEK PEMBANGUNAN PENANGANAN ROB ERETAN KABUPATEN INDRAMAYU JAWA BARAT. Citizen : Jurnal Ilmiah Multidisiplin Indonesia, 3(1), 70–76. https://doi.org/10.53866/jimi.v3i1.101