[1]
Sutarto, A. and Fauzy, K.I. 2023. ANALISA OPTIMASI WAKTU DAN BIAYA DENGAN MENGGUNAKAN METODE DURATION COST TRADE OFF PADA PROYEK PEMBANGUNAN PENANGANAN ROB ERETAN KABUPATEN INDRAMAYU JAWA BARAT. Citizen : Jurnal Ilmiah Multidisiplin Indonesia. 3, 1 (Mar. 2023), 70–76. DOI:https://doi.org/10.53866/jimi.v3i1.101.