Study of Rig "AB-1" Specifications on Wells “Batara” Based on Data Drawworks, Hook Load and Mud Pump

Authors

  • Nijusiho Manik Sekolah Tinggi Teknologi Minyak dan Gas Bumi Balikpapan
  • Rohima Sera Afifah Sekolah Tinggi Teknologi Minyak dan Gas Bumi Balikpapan
  • Andi Jumardi Sekolah Tinggi Teknologi Minyak dan Gas Bumi Balikpapan
  • Fatma Fatma Sekolah Tinggi Teknologi Minyak dan Gas Bumi Balikpapan
  • M.Rizal Fahrun Sekolah Tinggi Teknologi Minyak dan Gas Bumi Balikpapan
  • Zavta Rizki Sekolah Tinggi Teknologi Minyak dan Gas Bumi Balikpapan

DOI:

https://doi.org/10.53866/jimi.v2i4.136

Keywords:

Casing, Hook Load, Drawworks, Mud Pump

Abstract

The analysis conducted in this study focuses on the "AB-1" rig's ability to handle calculated loads. Results show that at 1,248 ft MD with 13 3/8" casing, the hook load and drawworks are both 84,864 pounds. At 5,818 ft MD with 9.5/8" casing, these values increase to 273,446 pounds. At 8,463 ft MD using dual 3.1/2 tubing, the load is 159,748.8 pounds. Mud pump power calculations reveal pressures of 681,408 psi for surface sections and 5,632.97 psi for production sections. Casing is a steel pipe inserted into a wellbore to prevent wall collapse, isolate abnormal pressure zones, and provide space for subsurface equipment during hydrocarbon production. This study aims to evaluate the casing load by analyzing hook load, drawworks, and mud pump power. Hook load represents the weight supported by the rig, including the accumulation of pipe weight, casing weight, and drag forces. Drawworks serve as lifting equipment for casing and tubing during drilling operations, while mud pumps circulate drilling fluids to support the process. Based on these findings, the "AB-1" rig is deemed suitable for operations with a hook load and drawworks capacity of up to 500 tons (1,000,000 pounds) and a mud pump pressure limit of 5,787 psi

References

Adams, N. J., & Charrier, T. (1985). Drilling engineering: A complete well planning approach. PennWell Publishing Co.

Aly Rasyid. (2021). Seleksi material untuk casing sumur migas & geothermal. Kementerian Pendidikan dan Kebudayaan Republik Indonesia.

Fadlih, A., & Megawati, E. (n.d.). Analisa pengaruh konsentrasi AmDEA terhadap penyerapan gas karbon dioksida (CO₂).

Kementerian Pendidikan dan Kebudayaan Republik Indonesia. (2013). Dasar-dasar teknik pengeboran.

Kumalasari, I. P., Monde, J., Willard, K., Pengolahan Migas, T., & Sekolah Tinggi Teknologi Minyak dan Gas Bumi. (n.d.). Peran mikroorganisme EM4 pada reaktor microbial fuel cell dengan sistem double chamber.

Prasetyawati Umar, E., Studi Teknik Geologi, P., & Sekolah Tinggi Teknologi Migas Balikpapan. (2022). Pemodelan log total organic carbon (TOC) menggunakan metode Passey, regresi multi linear dan neural network. PETROGAS, 4(1).

Rabia, H. (1985). Oil well drilling engineering: Principles and practice. Graham & Trotman Inc.

Rabia, H. (2002). Well engineering & construction. Entrac Consulting Limited.

Rivaldi, M. (2018). Evaluasi kapasitas rig onshore untuk pemboran berarah tipe “S” pada sumur X Lapangan Y. PETRO: Jurnal Ilmiah Teknik Perminyakan, 7(1).

Rubiandini, R. (2009). Teknik operasi pemboran 1. Institut Teknologi Bandung.

Downloads

Published

2022-11-28

How to Cite

Manik, N., Afifah, R. S., Jumardi, A., Fatma, F., Fahrun, M., & Rizki , Z. (2022). Study of Rig "AB-1" Specifications on Wells “Batara” Based on Data Drawworks, Hook Load and Mud Pump. Citizen : Jurnal Ilmiah Multidisiplin Indonesia, 2(4). https://doi.org/10.53866/jimi.v2i4.136