Optimasi Sucker Rod Pump (SRP Pada Sumur “TMT”-Y Lapangan X
DOI:
https://doi.org/10.53866/jimi.v3i4.181Keywords:
Sucker Rod Pump, Optimization, Production RateAbstract
The Sucker Rod Pump installed in the TMT-Y Field X experienced a decrease in production because the pump capacity that has been used for a longer tim e is no longer in accordance with the pump capacity. From the initial data the production rate was known to be 350 bpd, judging from the production capacity of the TMT-Y well in Field X, the value of Qmax was 415.55 bpd and the productivity index value of 1.1 into the classification of medium well performance, the well still has the potential to produce more. Therefore, performing pump optimization calculations to increase productivity, the previous method I used was optimization of five scenarios. This optimization is carried out using five scenarios, in scenario 1 using a 2- inch plunger with 5/8 and 7/8 inch rods to calculate the pump optimization in scenario 2 using a 2 inch plunger and 5/8 and 7/8 inch rods. The production rate in scenario 1 is 365.7 bpd, the pump stroke length is 94 inches and the pump speed is 7.4 spm. the results of scenario 2 obtained a production rate of 370.7 bpd, a pump stroke length of 91 inches and a pump speed of 6.6 spm. In the results of scenario 3, a production rate of 368.7 bpd a pump stroke length of 90 inches and a pump speed of 6.5 spm was obtained in scenario 4 the results obtained a production rate of 367.6bpd, 76-inch pump stroke length and 5.5spm pump speed. The result of scenario 5 cannot be used the results of the intersection and the flow rate. Among the five scenarios, the best scenario is scenario 2, because if you look closely, the production rate increases from the initial production flow rate, which is from 350 bpd, which is higher to 370.7 bpd.
References
Bishop, M. G. (2001). South Sumatra Basin Province, Indonesia: The Talang Akar-Cenozoic Total Petroleum System. Open File Report 99-50-S. USGS, Colorado.
Brown, K. E. (1977). The technology of artificial lift methods (Vol. 1). PennWell Publishing Company, Tulsa, Oklahoma.
Brown, K. E. (1980a). The technology of artificial lift methods (Vol. 2A). PennWell Publishing Company, Tulsa, Oklahoma.
Brown, K. E. (1980b). The technology of artificial lift methods (Vol. 2B). PennWell Publishing Company, Tulsa, Oklahoma.
Brown, K. E. (1984). The technology of artificial lift methods (Vol. 4). PennWell Publishing Company, Tulsa, Oklahoma.
De Coster, G. L. (1974). The geology of the Central and South Sumatra Basin. In Proceedings of the Indonesian Petroleum Association 3rd Annual Convention (pp. 70–110). IPA.
Diba, A. F., Mukmin, M. N., & Afifah, R. S. (2023). Analisa lumpur pemboran terhadap swelling clay pada sumur “X” Lapangan “Affikah”. Petrogas: Journal of Energy and Technology, 1(1), 46–56. https://doi.org/10.58267/petrogas.v1i1.151
Herlambang, A. S. (2020). Tinjauan umum peralatan produksi Sucker Rod Pump Laboratorium Produksi Menggung. Laporan Kerja Praktik, PPSDM Migas, Program Studi Teknik Perminyakan, STT Migas Balikpapan.
Malrin, E., Studi, P., Perminyakan, T., Tinggi, S., & Migas, T. (2022). Terhadap produksi reservoir multilayer. Petrogas, 4(September), 1–16.
Pulunggono, A., Haryo, A., & Kosuma, C. G. (1992). Pre-Tertiary serta Tertiary fault system as a framework of the South Sumatra Basin: A study of SAR-MAPS. In Proceedings of the Indonesian Petroleum Association 21st Annual Convention (pp. 339–360). IPA.
Purwaka, E. (2018). Perencanaan ulang Sucker Rod Pump pada sumur X Lapangan Y. Jurnal Offshore, 2(1), 51–57. Program Studi Teknik Perminyakan, Fakultas Teknik, Universitas Proklamasi 45 Yogyakarta.
Robyan, N. (2021). Melakukan optimasi dengan desain artificial lift berjenis Sucker Rod Pump pada sumur “O-12”. Program Studi Teknik Perminyakan, STT Migas Balikpapan.
Sima, N. (2020). Optimasi hydraulic pumping unit pada sumur “WN-98” Lapangan “X”. Program Studi Teknik Perminyakan, STT Migas Balikpapan.
Sima, N., Sinaga, J. F., Perminyakan, T., Migas Balikpapan, Jl. Soekarno-Hatta Km, S., & Joang Kalimantan Timur, K. (2022). Optimasi hydraulic pumping unit pada sumur “WN-98” Lapangan “X”. Petrogas, 4(1), 47–56.
Suyono, A., Suherman, A., & Herlina, W. (2018). Kajian teknis pompa SRP untuk optimasi produksi sumur AS-100 di JOB Pertamina-Jadestone Energy (Ogan Komering) Ltd., Air Serdang Field. Jurusan Teknik Pertambangan, Fakultas Teknik, Universitas Sriwijaya.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2023 Rafi Wahyu, Risna Risna, Firdaus Firdaus, Ammiruddin Ammiruddin, Rohima Sera Afifah, Dody Finansa

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

















