Analisis Keekonomian Penggunaan Hydraulic Pumping Unit (HPU) Pada Sumur “ST-27” Lapangan X

Authors

  • Semuel Tappangan Sekolah Tinggi Teknologi Minyak dan Gas Bumi Balikpapan
  • Muhammad Nur Mukmin Sekolah Tinggi Teknologi Minyak dan Gas Bumi Balikpapan
  • Firdaus Firdaus Sekolah Tinggi Teknologi Minyak dan Gas Bumi Balikpapan
  • Bambang Sugeng Sekolah Tinggi Teknologi Minyak dan Gas Bumi Balikpapan
  • Selvia Sarungu Sekolah Tinggi Teknologi Minyak dan Gas Bumi Balikpapan
  • Abraham Rontinsuku Sekolah Tinggi Teknologi Minyak dan Gas Bumi Balikpapan

DOI:

https://doi.org/10.53866/jimi.v2i4.125

Keywords:

Kutai Hydraulic Pumping Unit (HPU), Economic Analysis, NPV, POT, Sensitivity Analysis

Abstract

Well ST-27 in Field X is an oil well. Where the artificial lift used in this well is the Hydraulic Pumping Unit (HPU) and its use began in early 2013. The economic analysis is to ensure that the project undertaken provides benefits in accordance with the expected investment criteria. The method of economic analysis using the Hydraulic Pumping Unit (HPU) in the ST-27 Field X well is carried out by calculating the NPV and POT profit indicators. Meanwhile, the sensitivity analysis method for economic analysis is carried out for each element, namely oil production, oil prices, investment and production costs. For each element there is a change of 25%, 50%, 75% and 100%. An example of the calculation is by changing the oil price element by 50%, then the other elements do not change. Based on the economic analysis of the use of the Hydraulic Pumping Unit (HPU), the results showed that the NPV had a positive value of $1.002,309.33 and POT for 33.36 days. From the results of the sensitivity analysis of the economic elements using the Hydraulic Pumping Unit (HPU), the most influential on NPV are oil prices and oil production followed by production costs and investment. Meanwhile, the results of the sensitivity analysis of the economic element using the Hydraulic Pumping Unit (HPU) in the ST-27 Field X well that most influence the POT are oil prices and oil production followed by investment and production costs

References

Anggriani, D. (2008). ANALISISKEEKONOMIAN PEKERJAAN KERJA ULANG PADA SUMUR D-x DI PT. MEDCOE&P INDONESIA SANGA-SANGA. Balikpapan: STT Migas Balikpapan.

Bank Indonesia. (2021, December 31). Informasi Kurs. Retrieved from www.bi.go.id: https://www.bi.go.id/id/moneter/informasi-kurs/referensi- jisdor/Default.aspx

Beggs, H. D. (1991). Production Optimization. Tulsa: Oil & Gas Consultan International,tInc.

Bishop,M.G.2001.SouthSumatraBasinProvince,Indonesia:TheLahat/TalangAkarCen ozoic Total Petroleum System. US

Brown,K.E.(1980).TheTechnologytofArtificialLiftMethod(Vol.2A).Tulsa, Oklahoma:Pen Well Publishing Company.

Craft, B. C., Graves, E. D., & Holden, W. R. (1962). Well Design Drilling and Production. Englewood Cliffs, New York: Prentice Hall, Inc.

De Coster, G. 1974. The geology of the Central and South Sumatra Basins.Indonesian Petroleum Association, Proceedings of the 3th Annual Convention, Jakarta, Vol: 3, pp. 77–110.

Fitriani. 2013. Perencanaan Pengangkatan Buatan Dengan Sistim Pemompaan Berdasarkan Data Karakteristik Reservoir. Journal of Earth Energy Engineering.

Halifah. (2008). Evaluasi Keekonomian Pengembangan Lapangan "S" Dengan PSC Ekonomi. Balikpapan: STT Migas Balikpapan.

Juniawan, G. R. (2011). Re-Optimasi Pompa Sucker Rod Berdasarkan Analisa Sonolog Pada Sumur XLapangan"Y". Yogyakarta: UPN Veteran Yogyakarta.

Kusrini M.T, D., & Abror, M. M. (2019). Analisa Perhitungan Keekonomian Lapangan “X” West Java Basin Menggunakan Metode PSC (Production Sharing Contract). Jurnal Migasian, Vol.3 No.2:1-7.

Mentri Energi dan Sumber Daya Mineral Republik Indonesia. (2021). Kepmen ESDMNo: 147 K/12/MEM/2021 Tentang Penetapan Harga Minyak Mentah Indonesia Bulan Desember 2021. Jakarta.

Musnal, A. (2015). Optimasi Perhitungan Laju Alir minyak Dengan Meningkatkan Kinerja Pompa Hydraulic Pada Sumur Minyak Di Lapangan PT. KSO Pertamina Sarolangon Jambi. Journal Of Earth EnergyEngineering.

Musper, K.A.F.R (1937). Geologische kaart van Sumatera: toelitching by blad 16 (Lahat),schaal 1:200.000 [Geological map of Sumatra Explanatory notes to sheet 16 (Lahat), scale 1:200.000. Dienst Mijnbouw Nedelandsch Indie.

Philippus, I. L. 2014. Analisa Lanjut Data Log Combinable Magnetic Resonance, Log Data Konvensional, Data Penunjang Dalam Evaluasi Zona-zona Non Produktif Pada LapanganX.Jakarta: Universitas Trisakti

Presiden RI. (2001). Undang-Undang Republik Indonesia No. 22 Tahun 2001 Tentang Minyak dan Gas Bumi. Jakarta.

Megawati, E., Rudiyanto, R., & Huda, A. M. M. (2019). Analisa Blending Solar Cn-48 Dengan Pertadex Cn-53. PETROGAS: Journal of Energy and Technology, 1(1), 30–35. https://doi.org/10.58267/petrogas.v1i1.10

Wakimin, S., Migas Balikpapan, S., Soekarno-Hatta, J. K., & Timur, K. (2019). Angka oktan, Blending, kondensat, Destilasi Artikel diterima 25 Februari. 36(1), 36–45.

Yanti, D., Rohani, A., Saleh, M., & Lutfi, M. (2022). Analisis Temperatur Pada Proses Terbentuknya Bahan Bakar Minyak (Bbm) Dengan Metode Pirolisis Pada Prototype Alat Pengolah Limbah Plastik Menjadi Bbm. PETROGAS: Journal of Energy and Technology, 4(2), 72–78. https://doi.org/10.58267/petrogas.v4i2.133

Downloads

Published

2022-11-28

How to Cite

Tappangan, S. ., Mukmin , M. N. ., Firdaus, F., Sugeng, B. ., Sarungu, S. ., & Rontinsuku , A. (2022). Analisis Keekonomian Penggunaan Hydraulic Pumping Unit (HPU) Pada Sumur “ST-27” Lapangan X. Citizen : Jurnal Ilmiah Multidisiplin Indonesia, 2(4), 749–755. https://doi.org/10.53866/jimi.v2i4.125